 |
We are scribing the weather cap to the arch top rail. |
 |
Terry spindle moulding the v groovd tongue & Groove panel boards from 125mm x 25mm redwood. In the background we can see one of the arch top frames ready for the panel infill. |
 |
Here we are finishing the contours of the arch top on a bobbin sander. |
 |
As you can see, the clamps are holding the two arch top pieces together and looking along the profile we can check to ensure we end up in this case with a perfectly matched pair. |
 |
A photo of a crossed left and right showing balance and symetry. This is a result of craftmenship and the production drawings from design support. |
 |
A finished pair ready for treatment. |
 |
The gates hanging on the posts during the fitting process. |
 |
They have had the additional cheek pieces fitted. |